Operations / OPS-52
Kelderby: switch Duisburg, Venlo, Liège and Breda to single sign-on, Saturday 04:30
Description
Second pilot weekend, same as OPS-51. Saturday 31 October, 04:30; bridge 05:00–09:00 (Clara, Oskar on call, Tom); Jonas as second engineer.
Before Saturday
- Henrik's group check for the four depots: done Tue 27 Oct; 7 Liège people were missing from the depot's group and were added the same day.
- Import emails compared with Entra ID UPNs for the four depots, so nobody gets "No account for this sign-in" (ENG-1838).
- Rehearsal on Thursday 29 October; Sanne Bech signs off after it.
- Clara emails each depot manager the time of the switch.
- Freeze from Friday 12:00; nothing in SAML or approvals code until after go-live.
Linked issues
- relates to OPS-51 Kelderby: switch Rotterdam, Antwerp and Ghent to single sign-on, Saturday 04:30 Done
- relates to ENG-1838 Duplicate people after the first single sign-on when the imported email differs from the Entra ID UPN Open
Bridge invite sent. I'll post the UPN check's result here on Thursday.